University of Delaware, Newark DE
Challenge:
Leak in chilled water pipe in manhole vault.
Solution:
Injection of polymer grout at (2) chilled water pipe penetrations In manhole vault, (6) CHW pipe penetrations at Butterfly Valve vault, and (2) Chilled water pipes buried outside Existing CUP building to fill voids immediately below these pipes as directed by the construction company. The eight penetrations through vault/manholes will be installed from within the vault/manholes, the 2 Pipes at the Exist. CUP building will be injected at depth from mulched area immediately outside the CUP building.
Results:
Sealed infrastructure and stabilized pipe